[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

6 MOT primary Voltage



Original poster: "tesla by way of Terry Fritz <twftesla-at-qwest-dot-net>" <tesla-at-paradise-dot-net.nz>

Team
Just tested a 6 MOT system with 300bps SRSG. Mots have total of 22mH primary
ballasting

The safety gap (across SRSG) set at 10mm fired furiously which suggests at
least 30kV across it.
This seems a lot given Vp ex MOT's is only 13kV or so, Has anybody
experienced mains resonant rise in their MOT primaries and if so what was
config and MMC size.
Tnx
Ted L in NZ